What was found
AIRCRAFT IN BASE VISIT: EPSU (12WL) FAILED CIDS1 EPSU SYSTEM TEST DURING T/C 26L00025011. REMOVED AND REPLACED EPSU (12WL) IAW AMM 33-51-38 OPS CHECK. GOOD OK FOR SVC IAW AMM 33-51-38.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AIRCRAFT IN BASE VISIT: EPSU (12WL) FAILED CIDS1 EPSU SYSTEM TEST DURING T/C 26L00025011. REMOVED AND REPLACED EPSU (12WL) IAW AMM 33-51-38 OPS CHECK. GOOD OK FOR SVC IAW AMM 33-51-38.