What was found
AIRCRAFT IN BASE MAINTENANCE, LEFT ENGINE FORWARD MOUNT BOLTS FAILED TORQUE CHECK. REPLACED 4 EACH MOUNT BOLTS (WITH NEW WASHERS AND NEW NUTS) ON FORWARD MOUNT LEFT ENGINE, PER AMM 72-21-11.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AIRCRAFT IN BASE MAINTENANCE, LEFT ENGINE FORWARD MOUNT BOLTS FAILED TORQUE CHECK. REPLACED 4 EACH MOUNT BOLTS (WITH NEW WASHERS AND NEW NUTS) ON FORWARD MOUNT LEFT ENGINE, PER AMM 72-21-11.