What was found
AIRCRAFT IN BASE MAINTENANCE, RIGHT ENGINE, FORWARD MOUNT BOLTS FAILED TORQUE CHECK. REPLACED ALL FORWARD MOUNT BOLTS (WITH NEW WASHERS AND NEW NUTS) RIGHT ENGINE, PER AMM 71-21-12.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AIRCRAFT IN BASE MAINTENANCE, RIGHT ENGINE, FORWARD MOUNT BOLTS FAILED TORQUE CHECK. REPLACED ALL FORWARD MOUNT BOLTS (WITH NEW WASHERS AND NEW NUTS) RIGHT ENGINE, PER AMM 71-21-12.