What was found
AIRCRAFT IN BASE MAINTENANCE: EMERGENCY POWER SUPPLY UNIT BATTERY MID RIGHT FAILS TEST. **SUPPLEMENTAL REPORT FOR AALA202112102131: REMOVED CEILING PANEL 231JC PER A321 AMM 25-23-41-000-001-A. PERFORMED OPERATIONS CHECK ON MID LEFT EMERGENCY POWER SYSTEM UNIT BATTERY PER A321 AMM 33-51-00-710-006-A. OPERATIONS CHECK GOOD. INSTALLED CEILING PANEL 231JC PER A321 AMM 25-23-41-400-001-A. OPERATIONS CHECKED EMERGENCY EXIT SIGNS PER A321 AMM 33-51-00-710-008-A. OPERATIONS CHECK GOOD.** (CLOSED)