What was found
AIRCRAFT WAS NOT GROUNDED: AFT CREW REST DOOR IS DIFFICULT TO OPEN. MAINTENANCE SECURED LOOSE SCREWS IN HANDLE ASSEMBLY PER CMM 25-21-16 AND ACCOMPLISHED A SATISFACTORY OPERATIONAL CHECK.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AIRCRAFT WAS NOT GROUNDED: AFT CREW REST DOOR IS DIFFICULT TO OPEN. MAINTENANCE SECURED LOOSE SCREWS IN HANDLE ASSEMBLY PER CMM 25-21-16 AND ACCOMPLISHED A SATISFACTORY OPERATIONAL CHECK.