What was found
AFW - FLOOR BEAM AT STA 365, RBL 25, HAS CORROSION BLENDED BEYOND SRM LIMITS. PER MRB 757-702. TST, 15,723.22 HOURS. CYCLES, 5740. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AFW - FLOOR BEAM AT STA 365, RBL 25, HAS CORROSION BLENDED BEYOND SRM LIMITS. PER MRB 757-702. TST, 15,723.22 HOURS. CYCLES, 5740. (X)