What was found
TUL - UPPER FLOOR BEAM CAP HAS BULGES AT RBL 18 TO RBL 19 STA 380, CORROSION AT RBL 16 TO RBL 12, AND CRACK AT RBL 18 TO RBL 19 STA 380. REPAIRED FLOOR BEAM CAP IAW SRM 53-10-8 PAGE 9B. TST: 76,923 HOURS. CYCLES: 52,656. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
TUL - UPPER FLOOR BEAM CAP HAS BULGES AT RBL 18 TO RBL 19 STA 380, CORROSION AT RBL 16 TO RBL 12, AND CRACK AT RBL 18 TO RBL 19 STA 380. REPAIRED FLOOR BEAM CAP IAW SRM 53-10-8 PAGE 9B. TST: 76,923 HOURS. CYCLES: 52,656. (X)