What was found
TUL - CORROSION ON NR 2 FUEL TANK CENTER SECTION LOWER SURFACE, STA 837, BELOW LEFT PLENUM. INSTALLED DOUBLER PER SRM 57-30-3, PAGE 21, FIG 8. TST: 69,183 HOURS. CYCLES, 47,232. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
TUL - CORROSION ON NR 2 FUEL TANK CENTER SECTION LOWER SURFACE, STA 837, BELOW LEFT PLENUM. INSTALLED DOUBLER PER SRM 57-30-3, PAGE 21, FIG 8. TST: 69,183 HOURS. CYCLES, 47,232. (X)