What was found
AFW - FLOOR BEAM CORRODED BEYOND SRM LIMITS AFTER BLEND-OUT. INSTALLED 0.050 INCH REPAIR STRAP PER ENGINEERING MRB 767-1528. TST: 27,657.11 HOURS. CYCLES: 4,334. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AFW - FLOOR BEAM CORRODED BEYOND SRM LIMITS AFTER BLEND-OUT. INSTALLED 0.050 INCH REPAIR STRAP PER ENGINEERING MRB 767-1528. TST: 27,657.11 HOURS. CYCLES: 4,334. (X)