What was found
TUL - CORROSION ON TOP SIDE OF FLOOR BEAM STA 380 RBL 27 - RBL 65. REMOVED CORROSION PER SRM 51-10-6. REPAIRED DAMAGED AREA ON FLOOR BEAM PER SRM 53-10-8, PAGES 9-A AND 9-B. TST: 54,792 HOURS. CYCLES: 33,779. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
TUL - CORROSION ON TOP SIDE OF FLOOR BEAM STA 380 RBL 27 - RBL 65. REMOVED CORROSION PER SRM 51-10-6. REPAIRED DAMAGED AREA ON FLOOR BEAM PER SRM 53-10-8, PAGES 9-A AND 9-B. TST: 54,792 HOURS. CYCLES: 33,779. (X)