What was found
AFW - CHORD (J-CAP) HAS CORROSION REMOVAL IN UPPER AND LOWER SURFACE. MATERIAL REMAINING IS BEYOND SRM LIMITS. REMOVED ALL CORROSION, ENSURED BLENDOUTS IN AREA OF NUTPLATES ARE FLAT TO ALLOW PROPER SEATING WHEN INSTALLED. REFINISHED BLENDED AREA PER SRM 53-00-07, FIG 1D1. TST: 27,816.53 HOURS. CYCLES: 4,326. (X)