What was found
CLT - DURING Q-2 CHECK VISUAL INSPECTION, FOUND A 4 INCH CRACK IN FUSELAGE FRAME (PARTIALLY SEVERED) AT BS 305 STR 4L. INSTALLED REPLACEMENT WEB PER SRM 51-10-02. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-2 CHECK VISUAL INSPECTION, FOUND A 4 INCH CRACK IN FUSELAGE FRAME (PARTIALLY SEVERED) AT BS 305 STR 4L. INSTALLED REPLACEMENT WEB PER SRM 51-10-02. (X)