What was found
SHEAR TIE AT FUSELAGE STATION 1087, LONGERON 2R WAS CRACKED. MAINTENANCE INSPECTED AND REPLACED THE SHEAR TIE IAW DC-9 SRM 51-30.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SHEAR TIE AT FUSELAGE STATION 1087, LONGERON 2R WAS CRACKED. MAINTENANCE INSPECTED AND REPLACED THE SHEAR TIE IAW DC-9 SRM 51-30.