What was found
RIGHT WING LOWER FORWARD STRUCTURE AT WING STATION 735 HAS CORROSION ON PANEL BRACE TEE CLIP STRUCTURE. REMOVED FWD BEAM AT STA 735, REMOVED TEE CLIP, FABRICATED NEW BEAM FROM 7075-T6 .063 PO 000975, FABRICATED NEW TEE CLIP FROM EXTRUSION BAC 1505-100609-7015-T6511 PO 0032344. TREATED, PRIMED AND PAINTED AND INSTALLED NEW FABRICATED PART IAW BOEING DWG 114T2300 IAW B767 SRM 51-20-01, 51-40-02, ACFT WAS GROUNDED.