What was found
AFTER BLOCKOUT, EICAS MESSAGE RT ENGINE FIRE LP1. PERFORMED RT ENGINE FIRE LP1 OPS CHECKED IAW AMM 23-11-00. EICAS ERASE PROCEDURE IAW AMM 31-41-00-2. NO FURTHER FAULTS NOTED. OPS CHECKED NORMAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AFTER BLOCKOUT, EICAS MESSAGE RT ENGINE FIRE LP1. PERFORMED RT ENGINE FIRE LP1 OPS CHECKED IAW AMM 23-11-00. EICAS ERASE PROCEDURE IAW AMM 31-41-00-2. NO FURTHER FAULTS NOTED. OPS CHECKED NORMAL.