What was found
DURING TAKEOFF, STATUS MSG: L ENG OH LP 2. DEFERRED IAW MEL 26-11-2-1 MX PROCEDURES COMPLIED WITH MBCB 7/31/26 PLACARD INSTALLED. A/C RETURNED TO SERVICE
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING TAKEOFF, STATUS MSG: L ENG OH LP 2. DEFERRED IAW MEL 26-11-2-1 MX PROCEDURES COMPLIED WITH MBCB 7/31/26 PLACARD INSTALLED. A/C RETURNED TO SERVICE