What was found
DURING APPROACH AFTER THE FLAPS WERE SELECTED TO 35 DEGREES, THE HYDRAULIC FLUID LEVEL IN THE MAIN RESERVOIR WENT TO STANDPIPE LEVEL. FOUND DEFECTIVE O-RING AT THE NR 3 ENGINE HYDRAULIC PUMP INLET ELBOW. REPLACED O-RING. SERVICED, LEAK, AND OPS CHECKED SYSTEM IAW DC 8 MM CHAPTER 29.