What was found
MAIN CABIN SUBFLOOR AT FS 782 RBL 46 STIFFENER FITTING IS CRACKED AT BOTTOM. FABRICATED AND INSTALLED REPLACEMENT FITTING IAW SRM 51-1-21, 51-1-20D, AND DWG 3641126.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN CABIN SUBFLOOR AT FS 782 RBL 46 STIFFENER FITTING IS CRACKED AT BOTTOM. FABRICATED AND INSTALLED REPLACEMENT FITTING IAW SRM 51-1-21, 51-1-20D, AND DWG 3641126.