What was found
DURING C-CHECK, FOUND FLOORBEAM VERTICAL SUPPORT FITTING AT STA 680 AND LBL 44 CRACKED. REPLACED FITTING IAW DC9 SRM 51-10-4.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-CHECK, FOUND FLOORBEAM VERTICAL SUPPORT FITTING AT STA 680 AND LBL 44 CRACKED. REPLACED FITTING IAW DC9 SRM 51-10-4.