What was found
DURING C-CHECK, FOUND RIGHT MAIN LANDING GEAR WHEEL WELL UPPER PRESSURE PANEL DOUBLER AT STATION 737 RBL 42 CORRODED. REPLACED DOUBLER IAW DC9 SRM 51-30-2.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-CHECK, FOUND RIGHT MAIN LANDING GEAR WHEEL WELL UPPER PRESSURE PANEL DOUBLER AT STATION 737 RBL 42 CORRODED. REPLACED DOUBLER IAW DC9 SRM 51-30-2.