What was found
EICAS STATUS MSG RT ENGINE FIRE LP 2 DISPLAYED. OPS CHECKED FIRE LOOP SYSTEM PER MM 26-11-00-5. OPS CHECK NORMAL. NO EICAS MESSAGE PRESENT. OK FOR CONT SERVICE. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
EICAS STATUS MSG RT ENGINE FIRE LP 2 DISPLAYED. OPS CHECKED FIRE LOOP SYSTEM PER MM 26-11-00-5. OPS CHECK NORMAL. NO EICAS MESSAGE PRESENT. OK FOR CONT SERVICE. (M)