What was found
FLAP LEVER UP, FLAP POINTERS UP, EICAS MSG LE SLAT ASYM, LEADING EDGE LIGHT ON DURING CLIMB, RUDDER TRIM 3-4 UNITS TO THE RIGHT TO CENTER COLUMN. FIM PROCEDURE 27-81-00 FIG 105 WAS ACCOMPLISHED. IN ACCORDANCE AMM 27-51-01/201 FLAP SLAT ELECTRONIC UNIT NR 1 AND NR 3 WERE REPLACED, OPERATIONAL TEST SATISFACTORY. AS PER FIM27-81-00 FIG.105 SHEET 1 BLOCK 1 AND 40 WAS PERFORMED AND FIM 27-51-0. IAW AMM 27-81-41 AT SLAT LOSS SW LEVER ARM WAS REPLACED, IAW AMM 27-81-41. TEST WAS PERFORMED AND THE SYSTEM IS OK.