What was found
FEB 18. DURING DESC TO SKPS THE APU BLEED ON ECAM APPEARS AIR APU BLEED FAULT. CORRECTIVE ACTIONS: FEB 18. IN ACCORDANCE WITH MEL 36-12-01 CAT "C" THIS REPORT IS DEFERRED TO DMI W/O:2130037 CNMCC-2019-AV0925 FEB 21. IN ACCORDANCE WITH TSM 36-12-00-810-801-A FAILURE OF THE APU BLEED SUPPLY, STEP 4.B(1)(A) THE PREVIOUS LEGS REPORT SHOWS INLET PRESS XDCR (8048KM) FEB 26. IN ACCORDANCE WITH AMM 49-51-21 PB 401 CONF 16 TRANSDUCER -APU INLET PRESSURE WAS REPLACED AND APU SELF TEST WAS PERFORMED AND SATISFACTORY.