What was found
JUL 31. DURING CLIMB HYD Y RSVR LO LVL FOLLOWER BY Y ENG 2 PUMP LO PR COME ON ECAM. SUPPORT REMOVED AND REPLACED IAW AMM 20-23-11 PB 201 CONF 00. THE HYD TUBING SYS YELLOW WAS INSTALLED AND AMM 29-00-00-210-003-A DETAILED VISUAL INSPECTION FOR CORRECT INSTALLATION OF THE YELLOW SYSTEM WAS ACCOMPLISHED IN THE MLG BAY. TORQUE WRENC P/N QD2FR75 S/N 0317112108 DUE DATE 07/NOV/2019. AND AMM 29-13-00-710-002-A OPERATIONAL TEST OF THE HYD YELLOW SYSTEM SATISFACTORY