What was found
SEP 24. DURING TAKE OFF JUSTON INITIAL CLIMB E FELT 3 STALLS FROM ENGINE N-2 THE EGT REACHES 944 C° WE RETURN TO BOGOTA AS PER COMPANY POLICE PLEASE DOWNLOAD THE CVR AND THE FDR // CORRECTIVE ACTIONS: SEP 25. IN ACCORDANCE WITH TSM 73-00-00-810-866-A.THE BOROSCOPE INSPECTION WAS PERFORMED,STAGE 4,HPC ROTOR ASSEMBLY HPT BLADES AND STAGE 1,LPT BLADE SATISFACTORY.THE BOROSCOPE INSPECTION WERE INSTALLED // IN ACCORDANCE WITH AMM 71-00-00-710-009-B ENG RUN UP HIGH POWER BY FERNEY VELNDIA WAS PERFORMED , NO FAULT WAS FOUND