What was found
PILOT REPORT, 22.JUL.2021 -> (WO 16438431) TAKEOFF WAS ABORTED AT 60KT DUE TO ECAM ANNUNCIATION HYD B PUMP LO PR AND HYD B SYS LO PR. CORRECTIVE ACTION, 23.JUL.2021 -> IN ACCORDANCE WITH AMM 29-12-07-000-001-A AND AND AMM 29-12-17-400-001-A THE ELECTRIC PUMP PRESSURE SWITCH SYS HYD B WAS REPLACED. TEST SATISFACTORY.