What was found
PILOT REPORT 01.MAR.2022 WO 54'372'697=> DURING CLIMB HYD G RSVR LO PRS AND THE HYD G RSVR LO LVL ECAM ACTIONS WERE COMPLETED AND PRECEED TO BAQ
ACTION TAKEN 01.MAR.2022 =>IN ACCORDANCE WITH AMM 32-31-39-04 CONF 00 REV DATE 01 FEB 2022 THE HOSE NASSY FLEXIBLE IN THE ACTUATING CYLINDER MLG DOOR WAS REPLACED. 02.MAR.2022 => I.A.W AMM 29-00-00-280-006-A, STEP 4.A.2,A REV. 59, DATE: 01-FEB-2022.THE CHECK OF THE GREEN HYDRAULIC SYSTEM AFTER ENGINE PUMP FAILURE OR OPERATION IN A POSSIBLE CAVITATION CONDITION WAS PERFORMED SATISFACTORY. 02.MAR.2022 => FROM W.O 54372697 DURING CLIMB HYD G RSVR LO PRS AND THE HYD G RSVR LO LVL ECAM ACTIONS WERE COMPLETED AND PRECEED TO BAQ. IAW AMM 12-12-29--611-001-A REV 59 DATE 01-FEB-2022 THE FILLED AND SERVICING OF THE GREEN HYDRAULIC SYSTEM WAS PERFORMED. 02.MAR.2022 => FROM W.O 54372697 DURING CLIMB HYD G RSVR LO PRS AND THE HYD G RSVR LO LVL ECAM ACTIONS WERE COMPLETED AND PRECEED TO BAQ. IAW AMM 29-11-41-000-004-A AND AMM 29-11-41-400-004- REV 59 DATE 01/FEB/2022 THE DRAIN VALVE OF THE GREEN HYD RESERVOIR WAS REPLANCED OPERATIONAL TEST WAS SATISFACTORY 02.MAR.2022 => IAW AMM 29-11-00-710-001 OPERATONAL TEST OF THE G HYD SYST SATISFACROTY