What was found
HYD B SYS LO LVL FOLLOWED BY B SYS LO PR BLUE ELEC PUMP WAS TURNED OFF REQUEST BY ECAM WAS REMOVED THE HYD PUMP BLUE SYS (2075GJ) DUE WAS FOUND WITH HYD LEAK AT DRAIN IAW AMM TASK 29-12-51-000-001-A REV 73 WAS INSTALLED THE HYD PUMP BLUE SYS (2075GJ) IAW AMM TASK 29-12-51-400-001-A REV 73. TORQUE APPLIED TO PRESSURE PIPE (13) 265 LBF.IN, DRAIN NUT (11) 145 LBF.IN, CASE DRAIN PIPE (2) 265 LBF.IN AND SUCTION PIPE (16) 760 LBF.IN THEN WAS PERFORMED BLEEDING PROCEDURES OF THE BLUE HYD SYS UPSTREAM & DOWNSTREAM OF BLUE E-PUMP IAW AMM 29-00-00-870-008-A REV 73 REV-. TORQUE APPLIED TO NUT OF THE CASE DRAIN LINE (2) 265 LBF.IN & AMM 29-00-00-870-009-A TEST OK REV 73 REV-. PERFORMED LEAK CHK & NO HYD LEAKS FOUND.