As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
PRIOR TO RAISING INBD SLATS, A CAVITY CHECK FOR FOD AND CLEARANCE OF AREAS WAS CARRIED OUT. DURING THIS CHECK IT WAS FOUND THAT THE RT KRUGER FLAP SEAL ACTUATOR MOUNTING SIDE PLATE STRUCTURE HAD SNAPPED IN HALF. S/O RAISED TO REPLACE SIDE PLATE STRUCTURE AND INVESTIGATE FOR ANY MORE DAMAGE.