Service difficulty report · Warning System · Emb EMB135BJ

Difficulty date
October 11, 2014
Submitted
October 16, 2014
Operation
Air carrier
Aircraft
N605WG
Make and model
Emb EMB135BJ
Aircraft serial
14500980
Aircraft time
3,394 hours, 1,705 cycles
Engine
Rroyce AE3007A1E
Engine time
3,394 hours, 1,705 cycles
Part
Warning System
Condition
Activated
Location
Cockpit
Part time
3,394 hours, 1,705 cycles
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

WHILE CLIMBING THROUGH 17,000 FEET MSL IN ICING CONDITIONS, EXPERIENCED A NR 1 BLEED LEAK MSG & A NR 1 BLEED LEAK CAPSULE LIGHT ON THE ENVIRONMENTAL PANEL. PERFORMED QRH PROCEDURE, WHICH TURNS OFF THE NR 1 BLEED AIR & ISOLATES IT FROM THE ANTI-ICE SYS. ACCORDING TO THE PROCEDURE WE WERE LIMITED & COULD NOT ENTER ICING CONDITIONS BECAUSE WITHOUT NR 1 BLEED WE WOULD NOT BE ABLE TO ANTI-ICE THE STABILIZER. A RETURN WAS NOT POSSIBLE AS THE NORTHEAST WAS REPORTING ICING CONDITIONS & CONTINUING WAS NOT POSSIBLE DUE TO A MUCH HIGHER FUEL BURN CRUISING. WE DECIDED THE BEST COURSE OF ACTION WOULD BE TO DIVERT WHERE ICING WAS NOT AN ISSUE & MX WAS AVAILABLE. A NORMAL LANDING WAS MADE & MX WAS COORDINATED.

More about the Emb EMB-135BJ