What was found
N/R 629 - DURING C CHECK INSPECTION, FOUND THE FOLLOWING: MAIN CARGO COMPARTMENT FLOORBEAM AT STA LBL 45 & FS 1680 CORRODED. CORRECTIVE ACTION: CORROSION REPAIR IAW BOEING MESSAGE INW-LIM-00-00147H, DATED 10/23/00.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
N/R 629 - DURING C CHECK INSPECTION, FOUND THE FOLLOWING: MAIN CARGO COMPARTMENT FLOORBEAM AT STA LBL 45 & FS 1680 CORRODED. CORRECTIVE ACTION: CORROSION REPAIR IAW BOEING MESSAGE INW-LIM-00-00147H, DATED 10/23/00.