What was found
DURING C-CHECK INSPECTION THE FOLLOWING WAS FOUND; LT MAIN LANDING GEAR W/W UPPER SURFACE WITH 0.750 INCH CRACK, STA 934. DRILLED A STOP HOLE AT END OF CRACK IAW DC8 SRM 53-2-0, FABRICATED DOUBLER IAW DC8 SRM 53-2-0, PRIMED DOUBLER IAW DC8 SRM 51-1-8 AND INSTALLED DOUBLER IAW DC8 SRM 51-1-21.