As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING CLIMB-OUT, NR 2 GEN SYSTEM DEVELOPED A ZNS. AFTER PERFORMING ABNORMAL CHECK-LIST ONLY LT EMERGENCY BUSS WAS RESTORED. REMOVED AND REPLACED CSD AND AC GENERATOR IN ACCORDANCE WITH DC-8 M/M 24-10-1 AND 24-20-1. LEAKS CHECKED; NO LEAKS NOTED; GENERATOR (GND) TEST NORMAL IN ACCORDANCE WITH M/M 24-00 AND M/M 71-00.