Service difficulty report · Wire · Doug DC1030

Difficulty date
May 17, 2008
Submitted
May 28, 2008
Operation
Air carrier
Aircraft
N526MD
Make and model
Doug DC1030
Aircraft serial
46998
Aircraft time
76,785 hours, 18,516 cycles
Part
Wire
Condition
Broken
Location
Regulator Valve
Stage of operation
CR
How discovered
O
Nature of condition
N
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

NR 3 ENGINE PNEUMATIC PRESSURE GAUGE INDICATING 40 PSI W/PNEUMATIC SUPPLY SWITCH IN THE OFF POSITION. REPAIRED BROKEN WIRE AT ELECTRICAL CONNECTOR ON NR 3 ENGINE PNEUMATIC PRESSURE REGULATOR VALVE IN ACCORDANCE WITH DC10 M/M 36-12-01 AND OPERATIONAL CHECK FOUND NORMAL IN ACCORDANCE WITH DC10 M/M 36-12-01.

More about the Doug DC-10-30