What was found
PAE - CORROSION AFT CARGO BAY ON SHEAR TIE. REMOVED CORRODED SHEAR-TIE, FABRICATED REPAIR PARTS AND INSTALLED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PAE - CORROSION AFT CARGO BAY ON SHEAR TIE. REMOVED CORRODED SHEAR-TIE, FABRICATED REPAIR PARTS AND INSTALLED.