What was found
PHX-DURING SCHEDULED 30K CHECK THE AFT CARGO COMPARTMENT LONGERON 30 SPLICE AT STA 1212 WAS FOUND TO BE CORRODED WHERE THE FRAME BUTTS TO THE SPLICE.REPAIRED PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PHX-DURING SCHEDULED 30K CHECK THE AFT CARGO COMPARTMENT LONGERON 30 SPLICE AT STA 1212 WAS FOUND TO BE CORRODED WHERE THE FRAME BUTTS TO THE SPLICE.REPAIRED PER SRM.