What was found
PAE - DURING SCHEDULED C-CHECK, FOUND MAIN LANDING GEAR BEAM AT WING STATION 110 CHAFED. REPAIRED BEAM PER EA. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PAE - DURING SCHEDULED C-CHECK, FOUND MAIN LANDING GEAR BEAM AT WING STATION 110 CHAFED. REPAIRED BEAM PER EA. (M)