What was found
PAE - DURING C-CHECK, FOUND CARGO BAY CEILING SUPPORT SHROUD AT BS 500A-500B, LEFT BUTTOCK LINE 43 CORRODED. REMOVED AND REPLACED SUPPORT SHROUD PER SRM. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PAE - DURING C-CHECK, FOUND CARGO BAY CEILING SUPPORT SHROUD AT BS 500A-500B, LEFT BUTTOCK LINE 43 CORRODED. REMOVED AND REPLACED SUPPORT SHROUD PER SRM. (M)