What was found
PAE - FOUND DURING D-CHECK, CORROSION ON SHEAR TIE AT STATION 328. REPAIRED SHEAR TIE PER SRM. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PAE - FOUND DURING D-CHECK, CORROSION ON SHEAR TIE AT STATION 328. REPAIRED SHEAR TIE PER SRM. (M)