What was found
RIGHT WING O/B FLAP O/B VANE GOUGED ON UPPER SURFACE 68 INCHES FROM O/B END. PREPAIRED DAMAGED AREA, FABRICATED DOUBLER AND INSTALLED IAW SRM 51-70-2 PG 23 PARA 18B AND 51-70-2 FIG 12.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RIGHT WING O/B FLAP O/B VANE GOUGED ON UPPER SURFACE 68 INCHES FROM O/B END. PREPAIRED DAMAGED AREA, FABRICATED DOUBLER AND INSTALLED IAW SRM 51-70-2 PG 23 PARA 18B AND 51-70-2 FIG 12.