What was found
LEFT CENTER FUEL PUMP INOP. REMOVED AIRCRAFT POWER. ACCOMPLISHED FIM TASK 28 22 00 810 817. INSPECTED LEFT CTR FUEL BOOST PUMP WIRINGS C/B C845 R54 D11434 R962 D49996P/J D5348J/P AND D802. INSULATION AND CONTINUITY CHECK GOOD FROM C845 TO D802 REF WDM 28 23 11 AND AMM 28 22 00 200 801. NO FAULTS FOUND DURING INSPECTIONS. REPLACED C/B C845 RELAY R54 AND R962 AS PRECAUTIONARY PER TSR. RE-APPLY A/C POWER. LEFT CTR BOOST PUMP AND GFI OPERATIONAL TEST GOOD PER AMM TASK 28 22 41 720 802. DURING LEFT CTR PUMP OPERATION ACCOMPLISHED WIRINGS SHAKE AND TAP DOWN FROM C/B C845 TO PUMP CONNECTOR D802 WITH NO FAULTS. VERIFIED LEFT CTR BOOST PUMP SUCCESSFULLY TRANSFERS 15 000 LBS OUT OF CTR TANK.