What was found
HF NR 1 CIRCUIT BREAKER POPPED. CHECKED BEHIND P18 2 PANEL FOR CONTAMINATION OR DEFECTS NONE NOTED. RESET C/B REF SWPM 20 60 01. ACCOMPLISHED GROUND VERIFICATION REF MM 23 11 21, OPS NORMAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
HF NR 1 CIRCUIT BREAKER POPPED. CHECKED BEHIND P18 2 PANEL FOR CONTAMINATION OR DEFECTS NONE NOTED. RESET C/B REF SWPM 20 60 01. ACCOMPLISHED GROUND VERIFICATION REF MM 23 11 21, OPS NORMAL.