What was found
AFT CARGO BAY, CORROSION ON AFT SIDE OF FRAME AT BS 887 AND FIRE BOTTLE SUPPORT STRUCTURE LOWER MOUNT POINT. ACFT GROUNDED. REMOVED LT AFT TRANSITION PANEL IAW SRM 51-40-02-0G-0, PARA 4, FIG 8. FABRICATED, LOCATED AND DRILLED NEW TRANSITION PANEL IAW SRM 51-40-05-0G-0, FIG 2, DETAIL I INSTALLED NEW TRANSITION PANEL IAW SRM 51-40-02-0G-0-PARA 4, W 1.50", O .040", R .019", L 2.50", D .021".