What was found
RT FUSELAGE BS 360, BETWEEN S24-25R HAS FRAME SHEAR TIE IS CRACKED. ACFT GROUNDED. REPAIRED FRAME IAW SRM 53-00-07-2R-7.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RT FUSELAGE BS 360, BETWEEN S24-25R HAS FRAME SHEAR TIE IS CRACKED. ACFT GROUNDED. REPAIRED FRAME IAW SRM 53-00-07-2R-7.