What was found
NR 1 IDG REQUIRED FREQUENT SERVICING. ACFT GROUNDED. PERFORMED IDG OIL SYS STATIC LEAK CHECK IAW AMM 24-11-00-700-801. FOUND IDG RETURN LINE FROM OIL COOLER FITTING LEAKING ON IDG, TIGHTENED FITTING AS REQUIRED. ALSO, REPLACED IDG FILL COUPLING PRESSURE FILL, IAW CMM 24-11-85. GROUND RAN NR 1 ENG FOR 10 MINUTES NO LEAKS NOTED. INSPECTED NR 1 ENG IDG OIL COOLER SHOWS NO SIGNS OF LEAKING.