What was found
MAIN CABIN FLOORBEAM CRACKED BS 540, BL 0, LBL 5. ACFT GROUNDED. REMOVED THE CRACKED FLOORBEAM IAW SRM 51-40-02, PARA NR 7. DRILLED TO FIT THE NEW FLOORBEAM IAW SRM 51-40-05. INSTALLED THE NEW FLOORBEAM IAW SRM 51-40-02, PARA NR 7.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN CABIN FLOORBEAM CRACKED BS 540, BL 0, LBL 5. ACFT GROUNDED. REMOVED THE CRACKED FLOORBEAM IAW SRM 51-40-02, PARA NR 7. DRILLED TO FIT THE NEW FLOORBEAM IAW SRM 51-40-05. INSTALLED THE NEW FLOORBEAM IAW SRM 51-40-02, PARA NR 7.