What was found
RT A/C PACK 44 PSI, LT A/C PACK 15 PSI, FL 360, N1 90.4%. RT PACK 30 PSI, LT PACK 30 PSI, FL 22, N1 60.0% GROUND IDLE/ LT & RT PACKS 15%. ACFT GROUNDED. TROUBLESHOT IAW FIM 36-10, TASK 810. DURING FURTHER EVALUATION FOUND A LEAKING PRSOV & STICKING VALVE. REMOVED & REPLACED THE PRSOV IAW AMM 36-11-04. GROUND VERIFICATION SUCCESSFUL.