What was found
DUCT PRESSURE SPLIT. DURING CLIMB LEFT 17 PSI, RIGHT 48 PSI. DURING CRUISE, LEFT 20 PSI, RIGHT 43 PSI. ACFT GROUNDED. PERFORMED FIM 36-10 TASK 804. ALL STEPS CHECKED GOOD UP TO PAR F(29). PER STEP F(29)(B). REPLACED THE NR 1 ENGINE 450 THERMOSTAT, IAW AMM 36-11-05. LEAK CHECKED GOOD. PERFORMED FIM REPAIR CONFIRMATION, ALL DUCT PRESSURES NORMAL AND WITHIN LIMITS OF GRAPH.