What was found
RIGHT STBY TEMP CONTROL VALVE FAILED AN OPS TEST IAW AMM 21-51-11-400-801. ACFT GROUNDED. REMOVED AND REPLACED THE RT TEMP STANBY CONTROL VALVE IAW AMM 21-51-11. OPS TESTED GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RIGHT STBY TEMP CONTROL VALVE FAILED AN OPS TEST IAW AMM 21-51-11-400-801. ACFT GROUNDED. REMOVED AND REPLACED THE RT TEMP STANBY CONTROL VALVE IAW AMM 21-51-11. OPS TESTED GOOD.