What was found
TRANSITION CHANNEL HAS SEVERAL SPOTS OF CORROSION BETWEEN BS 727I+8 - 787, RBL 21 AND 2 PUNCTURES AT BS 737, RBL 21. ACFT GROUNDED. REMOVED CORROSION BETWEEN BS 727I+8 - 737, FOUND OUT OF LIMITS IAW SRM 53-00-53, FIG 103, DETAIL D. REMOVED THE CHANNEL IAW SRM 53-00-53-2R-5. FABRICATED A REPAIR IAW SRM 53-00-53-2R-5, INSTALLED THE REPAIR IAW SRM 53-00-53-2R-5, DWG 146D7500, REV-.